Know which PacDrive failures could stop your production.
See what protection you already have, where the gaps are and what to do first.
ELAU PACDRIVE SPECIALISTS
Know which PacDrive failures could stop your production.
See what protection you already have, where the gaps are and what to do first.
ELAU PACDRIVE SPECIALISTS
Know which PacDrive risks could stop your production
See what protection you already have, where the gaps are and what to do first.
Are you prepared for a PacDrive failure?
A missing backup, incompatible spare or unavailable replacement can turn a single failure into prolonged downtime, emergency sourcing and missed production commitments.
Why consider a Site Risk Assessment?
Understand your risks and plan your next steps.
The assessment gives engineering, operations and finance a shared view of risk, so investment can be directed where it will provide the greatest protection.
Obsolete does not automatically mean unmanageable. Stock, repair support or a practical upgrade may provide a recovery route. Newer equipment can still carry availability and compatibility risks.
We assess PacDrive M and PacDrive 3 systems so you can decide where to invest and which equipment can stay in service.
- Reduce the likelihood and potential duration of prolonged downtime
- Identify gaps in backups, spare-parts coverage and recovery readiness
- Support planned maintenance, stock and capital-investment decisions
- Improve resilience across production lines without replacing equipment
What does the assessment cover?
Assess. Prioritise. Protect.
An on-site review of your installed PacDrive equipment, existing protection and recovery options, with recommendations prioritised by production impact.
Record what is installed
We record the equipment and protection in place.
- Installed equipment by line and location
- Backups taken or verified where access allows
- On-site spares and compatibility
- Models, serial numbers and photographs
Find the biggest risks
We assess where failure would have the greatest impact.
- Criticality and production impact by line
- Component availability and lead times
- Compatibility with existing equipment
- Gaps in backup and spares coverage
- Consequences of taking no action
Decide what to do next
We match actions to your risk, budget and production needs.
- Immediate priorities
- Planned improvements
- Longer-term strategy
- Risks that remain if you postpone action
What will your report tell you?
Know what needs attention first.
The report shows where you have adequate protection, where gaps remain and which actions should come first.- A documented asset register to support future planning
- Where existing protection is sufficient
- Your greatest recovery gaps and exposure
- Risk ratings and the likely production impact
- Recommended actions: what to do now and what can wait
- Risks that remain if you postpone action
Why DMC?
Specialist judgement, not an asset-tagging exercise
DMC is the only UK company 100% dedicated to ELAU PacDrive. With more than 20 years of experience across PacDrive M and PacDrive 3, our recommendations draw on practical knowledge of component-specific lifecycle risk, repairability, stock availability, firmware, backups, compatibility and realistic upgrade routes.
Because DMC supports the complete resilience journey, the assessment can lead to a balanced plan across people, technical support, spares, monitoring and upgrades.
